Drafted 2026-06-11, after the 0.1.0 release. 0.1.0 implements the full original design document (56 chapters): the 2-way SQL engine, the YAML route/job model and compiler, the Camel Main and Spring runtimes, security and IAM (managed and SQL-contract realms, SAML SP, SCIM), batch and operations (console, UI, traces), large-data streaming and file transfer, the test/coverage/reporting stack, multi-tenancy and app packaging, dialect portability, the Maven plugin, supply-chain tooling, Studio, and generated OpenAPI/htmx contracts. See CHANGELOG.md.

This document plans what comes next: closing the gap between “the framework is feature-complete against its design” and “teams build and operate real line-of-business (LOB) applications on it”. Horizons are ordered by what blocks a real application soonest. Phase numbers continue the original implementation plan (which ended at Phase 17). The further out a phase sits, the more it is direction rather than commitment; revisit this document at every minor release. Release trains per horizon are indicative, not promised. Horizon 8 (Phases 39–47) was added 2026-07-03 from a low-code gap review at 0.4.1.

What a typical business application (forms over data, approvals, printable documents, batch exchange with neighboring systems) still needs, against what 0.1.0 provides:

Need In 0.1.0
Multi-statement transactional writes (header + detail) command-json runs a single statement (plus an atomic outbox event)
Optimistic locking, audit columns not provided; hand-written per app
Business-rule validation input constraints only (type/required/range/enum/mask); no rule hooks
Mail, outbound webhooks, alert delivery absent
Printable documents (PDF) absent (CSV/TSV/Excel codecs exist)
UI and message localization absent (locale handling exists only in export formatting)
Scaffolding / code generation absent (CLI has serve and routes only)
Corporate SSO SAML SP yes; OIDC relying party not yet (JWT HS256 bearer only)
File/queue/HTTP integration recipes file-import/file-export exist; no polling triggers, no HTTP-call step, no broker recipes
Approval workflow absent (route governance reviews routes, not business documents)
Org-unit data scoping tenancy yes; organizational scoping not formalized
Object storage FileTempStore only (the TempStore SPI is ready)
Full-text search absent
HTTP caching absent
HA building blocks solid base: cluster-safe job claiming, JDBC session store; missing K8s assets and zero-downtime guidance
Distribution GitHub Releases only; no Maven Central, no Gradle plugin, no docs site
AI tooling dev-tool MCP server; app-declared MCP tools, resources, and Apps UI — for the main app and mounted apps — shipped (Phase 24)

Horizon 1 — application completeness (0.2.x)

Section titled “Horizon 1 — application completeness (0.2.x)”

Everything here is needed by nearly every LOB application; without it, teams fall back to hand-rolled glue inside the first week.

command-json grows from “one statement” to “one business operation”.

  • A command may declare an ordered list of SQL steps executed in a single transaction; later steps can bind values produced by earlier ones (generated keys via RETURNING/getGeneratedKeys per dialect capability). Each step stays a plain, SQL-tool-runnable 2-way SQL file.
  • Declared row-count expectations (expect: { rows: 1, onMismatch: conflict }) turn silent lost updates into 409 Conflict; a lint nudges version-column predicates on UPDATE.
  • Canonical audit binds — /* audit.user */, /* audit.now */ — resolved from the principal and clock, so audit columns are explicit in the SQL, never injected.
  • Constraint-violation mapping: unique/foreign-key SQLState errors map to field-level error payloads (and htmx inline errors) instead of opaque 500s.
  • Document-number sequences (gapless option with row-lock semantics) as a managed SQL contract.

Acceptance: an order header+lines form posts once, writes atomically, replays safely via the existing idempotency machinery, and a concurrent edit yields a 409 with a usable conflict hint.

  • A validate: block: cross-field rules using the core expression language (already whitelist-only), plus validation SQL contracts (SELECTs returning violations — uniqueness, existence, balance checks) executed in the command’s transaction.
  • A stable error model: rule codes, field paths, message keys (translations arrive in Phase 22).
  • A validation coverage kind: rules exercised by declarative suites.

Acceptance: a unique-email rule rejects with a field-scoped 422 in JSON and an inline error fragment in htmx, and the rule is testable in a declarative suite.

  • A notify: step for command pipelines and jobs: SMTP mail (camel-mail) with templates rendered by the existing engine (template trust modes apply), credentials via the SecretResolver SPI.
  • Delivery rides the existing outbox: at-least-once, retries and dead-letters visible in the operations console.
  • Outbound webhooks: HMAC-signed, retried from the outbox, delivery log in the ops UI.
  • Operations alerts (job failure, threshold breach) reuse the same channels.
  • A pdf codec behind the existing file-codec SPI (query-export/file-export), rendering HTML templates with page-oriented CSS (headers, footers, page numbers) and embedded CJK fonts.
  • Engine choice is a license-policy decision (ch. 50): openhtmltopdf (LGPL) vs an Apache PDFBox-based stack (Apache-2.0). Prototype both behind the SPI.
  • Deterministic output (fixed metadata timestamps) so exports stay reproducibility-friendly.
  • Per-app message catalogs (messages/<locale>.yml), locale resolution (user preference → Accept-Language → app default), message lookup in templates, localized validation and error messages, and locale-aware input parsing (dates/numbers) mirroring the export-side FormatSources.

Milestone M6 — a complete LOB slice: header+detail order entry with optimistic locking, declarative validation, a Japanese/English UI, a confirmation mail, and a printable PDF — built only with YAML, 2-way SQL, and templates, fully covered by declarative suites.

Horizon 2 — developer experience and AI (0.3.x)

Section titled “Horizon 2 — developer experience and AI (0.3.x)”

Phase 23 — scaffolding and project generation

Section titled “Phase 23 — scaffolding and project generation”
  • tesseraql new <app>: a runnable skeleton (manifest, config, migration, smoke suite).
  • tesseraql scaffold crud --table <t>: JDBC schema introspection generates list/detail/edit YAML, 2-way SQL with the Phase 18 audit/locking conventions, htmx pages, and declarative tests. Regeneration is idempotent and detects user edits (checksums, ch. 22.20).
  • Rebuild the example gallery on scaffolds so the generator is dogfooded in CI.

Phase 24 — AI-assisted development (MCP)

Section titled “Phase 24 — AI-assisted development (MCP)”

TesseraQL’s artifacts are declarative and machine-checkable (lint, declarative tests, coverage kinds, plan guard, reproducible generated output) — exactly the feedback loop a coding agent needs. Turn that into a product surface:

  • An MCP server exposing read tools (manifest, route/SQL sources, schema introspection, lint/coverage results, ops status) and gated write tools (scaffold, draft edits through Studio’s draft/apply mechanism, with the same path confinement and review gates).
  • Acceptance: an agent connected only via MCP scaffolds a table-backed route and iterates until lint, tests, and coverage pass — no direct filesystem access.

Delivered (see docs/ai-mcp.md): tesseraql mcp serves those tools over two transports — stdio for a local agent subprocess, and a Streamable HTTP endpoint for a shared development server (reusing the app’s tesseraql.security.jwt bearer verification, loopback by default, --read-only to drop the write tools). The protocol machinery — JSON-RPC dispatch, the tool model, and the transports — is a dependency-light, use-case-neutral module (tesseraql-mcp), so it is reusable beyond the dev tool.

Application MCP endpoints (delivered): a TesseraQL application declares its own MCP tools in YAML, the way it declares HTTP routes, so the running business application is AI-enabled. A query-json / command-json definition placed under mcp/ compiles to a SQL-backed tool whose input schema derives from the route’s declared input: constraints; the runtime serves it over the Streamable HTTP transport at /_tesseraql/mcp, driving the same McpHttpHandler the dev-tool server uses, under the same deny-by-default security (per-tool auth/policy, the bearer token threaded into the tool’s route), governance (risk scoring and the approval gate, a write tool reachable unauthenticated is advanced), lint (a write tool must declare a policy), and an mcp coverage kind. The dev-tool server was the first consumer of the protocol core; this is the second, and the reason the core was factored out rather than built into the CLI.

Application MCP resources (delivered): alongside its tools an application declares read-only MCP resources — context an agent attaches — as a kind: resource document under mcp/. A resource is a query-json definition addressed by a stable uri (it takes no arguments) with an optional mimeType; the compiler builds it into a read-only internal route, and the runtime answers resources/list / resources/read from the same /_tesseraql/mcp endpoint under the same per-resource security (the bearer token rides into the resource’s route; an unauthorized read is a resources/read JSON-RPC error). Lint keeps resources read-only and uri-addressed, the governance gate scores them like read routes (never advanced), and an mcp-resource coverage kind tracks the resources declarative suites exercise.

Application MCP Apps UI (delivered): a tool can hand back interactive UI instead of only JSON — the MCP Apps extension (SEP-1865). An application declares a UI resource as a kind: ui document under mcp/ — a query-html / page definition addressed by a stable ui:// uri — and a kind: tool document links to one with a ui: field. The compiler builds the UI resource into a read-only internal route that server-renders an hc-* fragment through the existing template pipeline (so any gap belongs upstream in the kit, mandatory rule 11, not in app CSS); the runtime serves it over the same /_tesseraql/mcp endpoint, tagging it text/html;profile=mcp-app, carrying its _meta.ui rendering hints, advertising a linking tool’s _meta.ui.resourceUri, and negotiating the io.modelcontextprotocol/ui extension in initialize. Security is per-resource (the bearer token rides into the route), lint keeps a UI resource HTML-rendering and uri-addressed (and rejects a dangling tool link), the governance gate scores it like a read route (never advanced), and an mcp-ui coverage kind tracks the UI resources declarative suites exercise.

Mounted-app tools (delivered): the runtime serves the MCP tools, resources, and UI resources declared by mounted and bundled system apps (design ch. 32), not only the main app, from the one /_tesseraql/mcp endpoint. Each app’s direct:mcp.* routes are compiled as they already were; the runtime now registers every hosted app’s MCP surface together (negotiating the MCP Apps UI extension when any of them serves a ui:// resource), and the startup route-conflict guard — which already spans HTTP routes across apps — also rejects a tool name, resource uri, or UI uri two apps would share. Security stays per-route: the bearer token rides into the declaring app’s route, and mounted apps share the main app’s config so policies and the JWT verifier resolve the same way. The single tesseraql.mcp.enabled flag governs the whole endpoint.

The application MCP surface stays behind the same SQL-first, governed-recipe invariants (extension principles 1–4); deeper Studio-copilot ambitions remain gated on the MCP loop proving its worth (decision point 4).

Milestone M7 — schema to verified CRUD in under ten minutes by hand, or hands-off via an MCP-connected agent.

Horizon 3 — enterprise sign-in and integration (0.4.x)

Section titled “Horizon 3 — enterprise sign-in and integration (0.4.x)”

OIDC relying party (authorization code + PKCE; tested against Entra ID, Okta, Keycloak), RS256/JWKS bearer validation, API keys for service callers, optional mTLS — all behind the existing authentication step and principal model, with IAM admin wizards like SAML’s.

RS256/JWKS and API keys (delivered, see docs/authentication.md): bearer JWTs verify with SHA256withRSA against a static publicKey or a jwksUri (JDK-only, no JOSE dependency); the JWKS key set caches and rotates by kid with an unknown-kid refetch floor so it cannot be flooded, and the expected algorithm is bound from config so alg: none and RS256/HS256 confusion are rejected. Service callers authenticate with auth: apiKey against config-declared clients holding only a key hash, mapped to an explicit principal so existing policies apply. Lint (TQL-SEC-4040..4046) and an api-key coverage kind keep both machine-checkable.

OIDC relying party (delivered, see docs/authentication.md): the new opt-in tesseraql-oidc leaf module self-installs via the RuntimeExtension SPI and serves the authorization-code + PKCE flow at /_tesseraql/oidc/{login,callback,logout}. Provider endpoints are discovered lazily; a single-use state/nonce/PKCE verifier (in tql_oidc_state) defeats CSRF, nonce replay, and code injection; the ID token is validated by reusing the RS256/JWKS verifier plus OIDC aud/nonce checks; and the principal is linked/provisioned through the identity contracts before the standard browser session is issued. JDK-only, with an oidc coverage kind, config lint (TQL-SEC-4050..4053), and a SAML-style Studio IAM admin wizard.

Mutual TLS (delivered, see docs/authentication.md): a route declares auth: mtls to authenticate a service caller by the X.509 client certificate a TLS-terminating edge (reverse proxy, ingress, or mesh sidecar) forwards in a configured header (URL-encoded PEM). The runtime parses it JDK-only, checks validity against an optional clock skew, optionally PKIX-validates it against a trustBundle as defense-in-depth, and matches its subject DN (order- and case-insensitive RDNs), a SAN value, or its DER SHA-256 fingerprint against declared clients deny-by-default — resolving to an explicit principal so existing policies apply. An mtls coverage kind and config lint (TQL-SEC-4060..4065) keep it machine-checkable. Phase 25 is complete.

Phase 26 — managed connectors (files and HTTP)

Section titled “Phase 26 — managed connectors (files and HTTP)”
  • Polling triggers (SFTP/FTPS/local directory) feeding file-import pipelines.
  • An http-call step for outbound REST in pipelines and jobs: secret-managed credentials, timeouts, circuit breaking, recorded in traces.
  • An inbound webhook recipe: signature verification and replay protection in front of a SQL pipeline.
  • All of it surfaces as recipes under the existing governance (route modes, allowlists, risk scoring) — Camel’s component catalog stays an implementation detail, not user API.

Outbound http-call (delivered, see docs/connectors.md): a batch-pipeline http-call step issues one synchronous outbound REST request and publishes the response (step.<id>.status/.body/.headers) to later SQL steps. It is a job step, not a transactional command-json step — a synchronous call cannot be rolled back, so a command’s outbound integration keeps riding the Phase 20 outbox webhook. All outbound HTTP is governed by tesseraql.http.outbound: deny-by-default egress allow-list (exact or *.wildcard hosts), SecretResolver-backed credentials resolved at call time, config timeouts with per-step overrides, and a per-host circuit breaker that fails fast on systemic failures. Each call is a tesseraql.http.call trace span. Lint (TQL-SEC-4070..4072) checks egress statically and an http-call coverage kind tracks the steps suites plan. Polling triggers and the inbound webhook recipe remain for later slices.

Polling file triggers (delivered, see docs/connectors.md): a file-import job declares a poll: trigger (a local directory or a remote SFTP/FTPS server) instead of an HTTP upload; the runtime watches the source and feeds every file through the job’s import: pipeline via the existing asynchronous, off-heap, operations-tracked transfer path, moving each file to a done/failed sub-directory. Reaching a remote host is deny-by-default (tesseraql.connectors.poll.allowedHosts), with SecretResolver-backed credentials; the Camel file/sftp/ftps consumer stays an implementation detail. Lint (TQL-SEC-4080..4081, TQL-YAML-1005..1006) and a file-poll coverage kind keep it machine-checkable.

Inbound webhook recipe (delivered, see docs/connectors.md): a webhook route is an HMAC-verified, replay-protected POST endpoint in front of a SQL pipeline. It authenticates the signed delivery (HMAC over <timestamp>.<body>, symmetric with the Phase 20 outbound webhook), rejects a stale timestamp outside the tolerance, and rejects a replay via a shared JDBC store (tql_webhook_seen, the SAML-replay basis) — all before a row is written. The verifier is configured centrally (tesseraql.connectors.webhooks), so the route carries no secret, and an unknown provider fails the build (never served unverified). A bad signature maps to 401, a replay to 409. Lint (TQL-SEC-4082..4083, TQL-YAML-1008) and a webhook coverage kind keep it machine-checkable. Phase 26 (managed connectors) is complete.

Outbox relay to a broker (Kafka/JMS) and a queue-consume recipe (broker → SQL pipeline with idempotency keys); at-least-once semantics documented end to end.

Postgres-native event channel (delivered, see docs/messaging.md): the built-in broker-free pg-notify transport answers “can we do messaging without Kafka or JMS?”. A command’s publish: block emits a domain event on the transactional outbox; a relay moves it onto a durable tql_event log and issues a PostgreSQL NOTIFY; a queue-consume route under consume/ claims it with FOR UPDATE SKIP LOCKED (woken by the notification, swept by a polling backstop) and runs its SQL pipeline, deduplicated by an idempotency key so at-least-once becomes effectively exactly-once per business key. NOTIFY is only the low-latency signal — the durable table is what guarantees delivery — so pg-notify is PostgreSQL-only. A second built-in transport, db-poll, makes the same durable queue portable across every dialect (MySQL, SQL Server, Oracle, and PostgreSQL behind a transaction-pooling proxy): it claims with each dialect’s SKIP LOCKED equivalent and polls on the backstop interval instead of waiting on NOTIFY — identical at-least-once delivery, only higher latency, and switching transport: is the whole change. The OutboxEventSink relay and the publish:/consume: YAML are the seam Kafka/JMS plug into without changing the DSL. Lint (TQL-SEC-4090..4091, TQL-YAML-1009..1010, TQL-YAML-1106) and a queue-consume coverage kind keep it machine-checkable. The Kafka and JMS broker transports (opt-in leaf modules) remain for later slices.

Milestone M8 — corporate SSO login, a nightly SFTP exchange with a legacy system, and commands emitting events consumed by another system — all declarative, all observable in the operations console.

Horizon 4 — LOB building blocks (0.5.x–0.6.x)

Section titled “Horizon 4 — LOB building blocks (0.5.x–0.6.x)”

A SQL-contract state machine, consistent with IAM’s managed/SQL realm duality: managed tql_workflow_* tables or app-owned contracts. YAML declares states, transitions, guards (expression language), and assignee resolution (SQL contracts); htmx task-inbox components; delegation, escalation, and deadlines via the scheduler; a full audit trail; a workflow coverage kind. The full design — resolving decision point 2 in favour of the native engine — is in docs/approval-workflow.md.

Assignee resolution, the task inbox, and scoped transitions all build on the org-unit foundation delivered in Phase 29 (the two are duals over one org graph — see Phase 29 and docs/data-scoping.md); that foundation lands in Phase 29 and is consumed here unchanged, rather than introducing a second org model.

Three slices, all delivered: (1) workflow core — the kind: workflow document, the transition engine (state check → guard → advance → command → history in one transaction, reusing the Phase 18 processor), the WorkflowStore managed/app duality, the TQL-WORKFLOW-31xx lint, and the workflow coverage kind; (2) assignee resolution + task inbox — the assign contract opens deadline-bearing tasks in the managed tql_workflow_task inbox, with framework-enforced authority (a document with open tasks may only be transitioned by a holder, else 403); (3) deadlines, escalation, delegation — a cluster-safe sweeper applies each breach’s onBreach exactly once (reassign to a fallback resolver, or escalate to auto-fire the named transition as the system), a built-in delegate endpoint reassigns a task to a chosen delegate, and a workflow notify: block enqueues assignment/escalation reminders on the Phase 20 channels. Phase 28 is complete.

Row-level/org-unit predicates derived from principal attributes (roles, groups, claims) as named, reusable declared SQL fragments, the row-level complement to multi-tenancy. The full design is in docs/data-scoping.md; in summary:

  • A kind: scope document under scope/ declares an ordered list of match arms — each a Policy-style role/permission/claim condition paired with an effect (all, none, or a 2-way SQL predicate fragment). Multiple matching arms compose additively (OR); no match is deny-by-default (1=0).
  • The predicate is injected at an author-chosen /*%scope name on alias */ (1=1) site (a new 2-way SQL directive, sibling to /*%if … */), parameterized, never by rewriting WHERE/FROM. A fragment is alias-parameterized ($ sentinel + on <alias>); a scope that needs a join is a correlated EXISTS, never a top-level join. Writes are scoped through the UPDATE/DELETE WHERE (a later slice).
  • A scope lint family (TQL-SCOPE-30xx, like the tenant-predicate TQL-TENANT-3001) and a data-scope coverage kind (one item per scope) keep it machine-checkable.
  • Masking integration: column-level role masking already works via FieldPolicy.policy; this adds row-level masking keyed off a scope flag column (unmaskWhen).

Three slices, all delivered: (1) scope core (attribute-based, no hierarchy); (2) the shared org-unit foundation (managed tql_org_unit/tql_org_closure maintained by an OrgUnitStore, or app-owned tables, the IAM managed/SQL realm duality) that Phase 28 also consumes; (3) masking integration (the /*%scope … as boolean */ flag directive plus FieldPolicy.unmaskWhen, masking a field in rows outside the caller’s scope). Phase 29 is complete.

Acceptance (slice 1, met): the same query, run by principals with different roles/claims, returns each caller’s rows only (a bypass role sees all, an unscoped caller sees none, roles compose additively); the scope is testable via the data-scope coverage kind; and the lint flags a directive naming an undeclared scope.

Phase 30 — attachments and object storage

Section titled “Phase 30 — attachments and object storage”

Business records carry files (an invoice PDF, a scanned form, a product image) stored as durable objects outside the database and addressed from SQL. The full design is in docs/attachments.md; in summary:

  • A durable BlobStore SPI (tesseraql-core, io.tesseraql.core.blob), a sibling of the ephemeral TempStore rather than a replacement for it — attachments are durable and retention-governed where spool is create-read-delete, so conflating the two would push spool traffic into object storage. The streaming primitives (off-heap write, checksum-as-you-stream) are reused; the store is not. FileBlobStore is the dependency-free local default.
  • A record-attachment recipe — a kind: attachment document under attachments/ synthesizes an off-heap upload POST and a download GET, with metadata in the managed/app duality (AttachmentStore SPI, managed tql_attachment or app-owned tables). The SQL-first payoff: download authorization is the metadata SELECT under the route’s policy: and the Phase 29 /*%scope ... */ directive — no second access-control path. The non-transactional blob write is reconciled by orphan GC, the same “commit the record, reconcile the side effect” discipline as the Phase 26 http-call and Phase 27 outbox.
  • An opt-in tesseraql-s3 leaf moduleS3BlobStore on AWS SDK for Java v2 (Apache-2.0, confined to the module like tesseraql-pdf’s engine), self-installing via RuntimeExtension when provider: s3. One module covers AWS and every S3-compatible store (R2, Ceph, B2) via endpoint/region/pathStyle/checksumMode; switching provider is the whole change. Egress is deny-by-default (tesseraql.object-storage.allowedBuckets), credentials ride the SecretResolver.
  • A scan-hook SPI (AttachmentScanner, ServiceLoader, no-op default) gating downloads on a clean scan, and retention wired to the ch. 44 RetentionSweeper (orphan GC plus an optional age policy) — driven by the sweep rather than provider lifecycle rules, which vary across compatible stores.

Three slices, all delivered: (1) attachment core — the BlobStore/FileBlobStore SPI, the kind: attachment recipe and metadata duality, the TQL-YAML-12xx lint, and the attachment coverage kind, on local storage alone; (2) tesseraql-s3 — the S3/S3-compatible implementation with deny-by-default egress and Adobe S3Mock compatibility ITs; (3) scanning and retention, completing the phase. Machine-checkable throughout: lint (TQL-YAML-12xx, TQL-SEC-411x, next free in each family) and an attachment coverage kind. Phase 30 is complete.

A dialect-aware full-text directive (PostgreSQL tsvector first, then per the capability matrix), still runnable in plain SQL tools via the 2-way mechanism. External engines (OpenSearch) only ever as an optional adapter.

Milestone M9 — an approval-workflow application with org-scoped data and attachments.

Horizon 5 — scale and operations (0.7.x)

Section titled “Horizon 5 — scale and operations (0.7.x)”

ETag/Cache-Control with 304 handling for query-json/query-html (htmx-aware), declared invalidation keys (a command declares which query caches it invalidates), and an opt-in result cache with TTL. Tenancy-safe keys; correctness over hit rate.

Phase 33 — deployment and operations maturity

Section titled “Phase 33 — deployment and operations maturity”

Kubernetes manifests and a Helm chart (probes, graceful drain of lanes and in-flight jobs, rolling-deploy guidance on top of reload safety), official container images, a tesseraql bench load harness for routes, a capacity/tuning guide, and alert routing through the Phase 20 channels.

Milestone M10 — two-node HA on Kubernetes: rolling deploys without dropped requests, exactly-once scheduled firings, shared sessions, alerts delivered.

Horizon 6 — the 1.0 contract (0.8.x → 1.0)

Section titled “Horizon 6 — the 1.0 contract (0.8.x → 1.0)”

Freeze YAML schema v1; SPI stability annotations (@Stable/@Evolving); a deprecation policy; cross-version upgrade tests (the ch. 30/31 machinery) running in CI.

Phase 35 — distribution and documentation

Section titled “Phase 35 — distribution and documentation”

Maven Central publication (GPG signing + central publishing; release evidence is already in place), the Gradle plugin (promised “later” by the build policy), official images, and a documentation site: tutorial, cookbook, and reference generated from the schemas and error taxonomy.

The documentation-site leg was named and delivered 2026-07-04 (design v2 in docs/docs-site.md, #275; the Starlight app #276; the generated reference in the following slice): docs-site/ is Astro Starlight on Cloudflare Workers Static Assets, mirroring the Hypermedia Components docs — Pagefind search, code highlighting, link validation, /llms.txt, a completeness-guarded sync that keeps docs/ the canonical tree, and a Reference section (the YAML surface from the JSON schema, the 300+ TQL-* codes from a source scan) generated as committed, drift-guarded markdown by tesseraql-docs-reference. The one-time Cloudflare dashboard setup is the runbook in docs-site/DEPLOYMENT.md (operator step). Maven Central, the Gradle plugin, and official images remain open.

Phase 36 — security review and support policy

Section titled “Phase 36 — security review and support policy”

Threat-model refresh, a hardening checklist pass (OWASP ASVS), fuzzing the parsers (2-way SQL, YAML, SCIM filters), and a supported-versions/LTS statement in SECURITY.md.

Milestone M11 — 1.0 GA on Maven Central with a documentation site and a compatibility contract.

Horizon 7 — ecosystem and a trusted app marketplace (post-1.0)

Section titled “Horizon 7 — ecosystem and a trusted app marketplace (post-1.0)”

Phase 37 — pluggable apps and a curated marketplace

Section titled “Phase 37 — pluggable apps and a curated marketplace”

A forward-looking direction (recorded 2026-06-19, not scheduled). Make TesseraQL apps distributable as plugins and, on top, a marketplace that shares only trusted apps. Three increments, each building on existing seams:

  1. Pluggable generators — a Scaffolder SPI: the CRUD generator becomes the default provider and third-party JARs contribute alternative scaffold styles, mirroring the existing FileCodec/PdfEngine/BlobStore SPIs (extension principle 5).

  2. Plugin apps + an SDK — whole apps already mount as plugins via AppSourceProvider + ServiceLoader (design ch. 32, 47 — the system apps are this), and AppSource already anticipates .tqlapp packages (a materializable file tree, not a bytecode JAR). The gap is ergonomics: a tesseraql new --plugin / Studio flow that scaffolds the module skeleton (pom, resources/tesseraql/apps/<name>/, the AppSourceProvider registration) — turning “ship an app as a plugin” from tribal knowledge into one command.

  3. A trusted-only marketplace — share only curated/verified apps. The de-risking decision is to constrain marketplace apps to declarative .tqlapp only (no custom Java / RuntimeExtension SPI): the capability surface is then the framework’s interpreted recipes — bounded, lintable, analyzable — so the framework is the sandbox and arbitrary bytecode never has to be isolated. The trust pipeline composes primitives that already exist:

    • Admission gate — the AppLinter (+ GovernanceGate) run as a “marketplace profile” the app must pass before publish: policies defined (deny-by-default), egress allowlisted, embedded variables enum-gated (TQL-SQL-2109), CSP intact, declarative-only.
    • Provenance — sign the package; attach an SBOM (SbomGenerator) and release evidence (ReleaseEvidence); pin the content hash (ScaffoldChecksum); the runtime verifies signature + hash before mounting.
    • Capability permits — the app declares the capabilities it needs (datasources, egress hosts, policies, MCP tools); the installer reviews and grants, extending tesseraql.modules opt-in and per-app enabled.
    • Curation — a marketplace operator approves publishers/apps (human trust atop the automated gate).

    Open questions (security-design-first — a design doc precedes code): the capability-permit manifest schema + install-time review; signature/key management + a publisher registry; the distribution registry + Studio browse/install UI; datasource-access scoping (which host data a marketplace app may reach, atop tenancy + scopes); resource/query budgets (a declarative app can still write expensive SQL); and multi-app Studio scope. Keeps extension principles 2 (declarative, governed), 3 (deny-by-default), 4 (machine-checkable), and 5 (module boundaries / SPI).

Horizon 8 — the low-code completion (0.5.x–0.7.x, interleaving Horizons 5–6)

Section titled “Horizon 8 — the low-code completion (0.5.x–0.7.x, interleaving Horizons 5–6)”

Added 2026-07-03 from a low-code gap review at 0.4.1 (the DSL surface, the runtime and operations story, and the end-to-end authoring experience were each inventoried against what a low-code platform owes its authors). Phases 18–30 closed the capability gaps; what remains is structural:

  1. The screen is the only layer that is not declarative. Routes, validation, workflows, scopes, menus, and MCP surfaces are YAML; pages are hand-written Thymeleaf + htmx (~50 lines per form), and input: constraints are duplicated into HTML attributes by hand.
  2. “Save and it is live” breaks exactly at creation. The hot reloader swaps existing route ids only; a scaffolded or newly created route needs a restart.
  3. The declarative floor sits below everyday needs — no declarative pagination, no regex/length/format validators, an expression language without arithmetic, untyped path parameters.
  4. A semi-technical author still drops into raw YAML and ops territory for connectors, SSO, secret references, and everything production.

Phases 39–44 close those gaps in DSL-then-Studio order; Phases 45–47 harden the production and adoption story they feed into. By value this horizon interleaves with Horizons 5–6: Phase 45 should land before Phase 33 (Kubernetes probes presuppose a truthful health surface), and Phase 47 rides Phase 35’s release train.

Corrections shipped ahead of any phase (ordinary fixes, no phase ceremony): the min/max bound check truncates decimals (InputBinder compares via number.longValue(), so max: 5 admits 5.9 and min: 0 admits -0.9 — compare as decimals); and a head.yml/options.yml route file is accepted by the manifest loader but fails deep in the route compiler (Unsupported HTTP method) — reject it at lint time with a clear code.

The UI layer joins the declarative surface: a kind: view document declares a list, form, or detail page over a table/route, and the compiler renders it through the existing template pipeline into Hypermedia Components markup (the same emitted-markup contract the route compiler already owns, mandatory rule 11). Fields derive from schema introspection plus the route’s input: constraints — one source of truth, ending the required/maxLength duplication into HTML — with explicit per-field overrides (label, widget, order, visibility). The full design — resolving decision point 7 in favour of interpretation — is in docs/declarative-views.md.

Declarative does not mean locked-in HTML (recorded 2026-07-03): the freedom-vs-declarativeness trade-off is resolved as a customization ladder, every rung an app-author surface:

  • L0 — view options: label, widget, order, visibility, formatting — plain keys in the view document. No HTML.
  • L1 — slots: a view declares named insertion points (header, actions, after-field, …) the app fills with its own fragments — the tql/shell :: shell(...) parameterized-fragment pattern applied to views.
  • L2 — pattern overrides: views render through framework-shipped pattern fragments (tql/view/list, tql/view/form, per-widget tql/view/field-date, …) resolved app-home-first with classpath fallback — one app-override resolver ahead of the shared tql/* resolver in Templates. Dropping templates/tql/view/form.html into the app restyles every form; a per-widget file retargets one widget everywhere; a template: key points a single view at a custom fragment. The Django-widget-template / Rails-form-builder model: fix a pattern once and every view follows, where ejected copies drift.
  • L3 — eject: generate the full template into the app tree and own it (the scaffolder’s checksum/edit-detection contract already models “generated until you touch it”), the view document remaining for data binding or dropped.

The pattern-fragment signatures (th:fragment="form(view, model)") and the view-model shape thereby become public API: versioned with the YAML schema, covered by the Phase 34 stability annotations, and linted — TQL-VIEW-* flags an unknown slot name or a signature-mismatched override. Framework-shipped patterns stay hc-conformant (rule 11); an override is app-owned markup with the same status as a hand-written template today.

  • Slice 1: list and form views (the CRUD 80%), rendered through the overridable tql/view/* pattern fragments (the L2 resolver ships from day one) onto the hc datagrid and mutating-form recipes; the TQL-VIEW-* lint family (unknown column/field, widget/type mismatch, unknown slot, signature-mismatched override) and a view coverage kind.
  • Slice 2: detail views and relations (parent + child-list composition), plus named slots (L1).
  • Slice 3: scaffold crud emits view documents instead of raw templates; the example gallery regenerates on views (dogfooded in CI).
  • Slice 4: dashboards — view: dashboard panels (stat/sparkline/chart/table) on the kit’s hc-grid; charts are deterministic server-rendered SVG wearing the kit’s CSS-only hc-chart skin (no upstream brief was needed — the component already ships; the earlier “only hc-sparkline” note repeated the Track-I mistake of grepping only the behaviors bundle).

Acceptance: adding a column to a table means a migration plus a view-YAML edit — zero HTML — and the scaffolded CRUD slice ships as views. This is also the substrate the form-driven editors (Phase 43) and the copilot (Phase 44) operate on: structured view documents are safely machine-editable where free-form Thymeleaf is not. All four slices are delivered (design + slices in docs/declarative-views.md). Phase 39 is complete.

Phase 40 — input, validation, and expression depth

Section titled “Phase 40 — input, validation, and expression depth”

The declared-input vocabulary grows to what LOB forms actually need, so rules stop leaking into hand-written SQL:

  • pattern (anchored regex), minLength, and format: email|uuid|url validators; decimal-typed min/max; conditional requiredness (requiredWhen, the same expression language as validate: rules).
  • Typed path parameters: path.* values bind through input: (coercion + constraints) instead of arriving as raw strings.
  • The core expression language gains arithmetic, string functions, and a whitelisted function set (still no method calls, no reflection), so qty * price <= budget is a declarable rule rather than a SQL contract.
  • Every addition extends the existing machinery: TQL-FIELD-* codes, localized messages, the validation coverage kind, and OpenAPI schema emission.

Delivered in two slices (the input vocabulary + typed path params + the pre-phase corrections; then the expression depth) — see docs/declarative-validation.md. Phase 40 is complete.

Phase 41 — declarative pagination and response shaping

Section titled “Phase 41 — declarative pagination and response shaping”
  • A page: block on query-json/query-html: offset or keyset strategy, declared page-size bounds, optional total count, and the response metadata/headers emitted automatically (htmx-aware for table fragments). The 2-way SQL stays plain-tool-runnable — the block appends the dialect’s pagination clause the way scaffolded SQL hand-writes it today.
  • Response shaping: computed/formatted fields over the row source, nested composition (a parent row with named child queries keyed into one document), and declarative mapping of business conditions to HTTP statuses (generalizing expect.onMismatch).
  • Lint and coverage kinds per surface; the OpenAPI generator learns both.

Delivered in two slices (pagination — docs/pagination.md; then response shaping — docs/response-shaping.md). Phase 41 is complete.

Phase 42 — the instant loop (hot-reload completeness)

Section titled “Phase 42 — the instant loop (hot-reload completeness)”

“Save and it is serving” becomes true for creation, not only edits:

  • Dynamic route addition and removal: a newly applied route (scaffold, new-route, Studio apply) compiles and mounts without a restart; removal un-mounts. The startup route-conflict guard runs incrementally.
  • Per-route failure isolation on reload: one broken definition takes only itself out (a clear 500 carrying the compile error) instead of poisoning whole-manifest recompiles — which also lets the menu editor and config edits stop avoiding route reloads.
  • Migrations: a migration created in Studio can be applied to the dev datasource from Studio, so schema → scaffold → serve needs no process bounce.

Acceptance: Studio’s scaffold-apply serves the new CRUD immediately; a deliberately broken route 500s alone while its neighbors keep serving; the M7 “ten minutes” flow never touches a terminal.

Delivered in two slices (dynamic route mounting with per-route failure isolation and tolerant manifest loads; then Studio’s Migrate now closing the migration → scaffold → serve loop, proven end-to-end by an integration test that never restarts the process). Phase 42 is complete.

Studio closes the remaining “drops into raw YAML” edges (slices tracked as Track J in docs/studio-backlog.md):

  • A form-driven route editor: recipe/auth/policy/inputs as structured fields (the menu-editor pattern applied to route YAML itself); the text editor stays the escape hatch.
  • Connector and SSO authoring: http.outbound, connectors.poll, connectors.webhooks, OIDC, and SAML through the same gated overlay-write path as policies — editing secret references (${secret.env.*}), never values, with egress allow-list changes behind the confirm gate. The IAM wizards become write-through instead of snippet downloads.
  • A test recorder: an API-console invocation saves as a declarative test case, so a citizen developer’s manual check becomes a regression test.
  • Data-browser row editing: PK-scoped single-row edit via a generated command, under audit + editRoles + confirm — the master-data maintenance screen nobody has to build.
  • Authoring feedback outside Studio: deepen the shipped JSON Schema and wire it into scaffolded repos (.vscode association); lint findings gain line/column.

Delivered in five slices (J1 route form, J2 connector/SSO write-through, J3 test recorder, J4 data-browser row edit, J5 authoring feedback — see docs/studio-backlog.md Track J for the per-slice detail). Phase 43 is complete.

The remaining half of decision point 4, now that the MCP loop has proven out (the studio_copilot prompt, the app-declared MCP surface): an in-Studio chat panel that drives the existing gated tools (draft → preview → lint/test → apply) as an MCP client. TesseraQL still ships no model and stores no key in app source — the operator configures a model endpoint, or the panel rides a connected agent (decision point 8) — and every mutation stays a separately gated, audited tool call with the human approving applies in the same diff-confirm UI. Describe → verified route, without leaving Studio.

Delivered as the in-Studio panel over an operator-configured OpenAI-compatible endpoint (decision point 8 resolved; see docs/copilot.md): reads free, writes only as audited drafts, apply human-only. Phase 44 is complete — Horizon 8 is now complete in full.

Phase 45 — production observability and safety

Section titled “Phase 45 — production observability and safety”

What a team hits in the first production week; sequenced ahead of Phase 33, whose probes and dashboards presuppose these signals:

  • Metrics a pull-based stack can consume: per-route latency/error histograms (today the Meter is counter-only and OTLP-push-only). Transport is decision point 9; ship a Grafana dashboard definition alongside.
  • Truthful health: a liveness/readiness split, a real datasource probe, and a DOWN state (today the roll-up never degrades past WARN).
  • Structured JSON logging with trace-id correlation, and an opt-in HTTP access log.
  • Safety valves: a default per-route SQL statement timeout (today a runaway query is unbounded), surfaced connection-pool tuning knobs, and documented — or shared-state — semantics for the per-node rate/concurrency limiters on multi-node deployments.
  • An opt-in business-route audit log (who called what, with declared decision-relevant params) riding the existing per-app ops scoping; per-app custom error pages.

Delivered in five slices (truthful health; Prometheus histograms + Grafana dashboard, resolving decision point 9; structured logging with trace-id correlation and the access log; the safety valves — default SQL timeout, pool knobs, per-node limiter semantics; the business-route audit log and custom error pages). Phase 45 is complete.

The dev → staging → prod story becomes first-class rather than implied git practice:

  • Config profiles: a per-environment overlay layer resolved by one switch, replacing ad-hoc ${...} indirection for the common cases; Studio’s overlay writes compose with it.
  • A release diff — “what does this deploy change”: routes added/removed/changed, the API diff (OpenApiDiff), the schema diff (SchemaDiff), the migration list, and policy changes, as a CLI/Maven report and a docs-portal page, generated from two app trees or a captured baseline.
  • A documented promotion recipe (git-native: Studio edits in dev → PR → CI governance gate → tagged .tqlapp/image), aligning the read-only-prod-Studio posture with an explicit path for how an edit gets there.

Delivered as environment profiles (config/env/<profile>.yml, one --env switch), the release diff (ReleaseDiff engine; CLI release-diff, Maven tesseraql:release-diff, and the docs-portal page), and the promotion recipe in docs/promotion.md. Phase 46 is complete.

Discovery has fallen behind capability. Complements Phase 35 (docs site, Maven Central) and the deferred Phase 38 tiers, on Phase 35’s release train:

  • A template gallery: complete starter applications (approval workflow, inventory, helpdesk) as declarative-only .tqlapp packages — each one also dogfoods the Phase 37 marketplace admission profile.
  • The five-minute demo: one command (serve --embedded-db plus seeded data and a Studio tour) and one container image that boots a browsable example with Studio open.

Milestone M12 — the low-code loop, closed: a semi-technical author adds a column and its screen behavior entirely in Studio — migration, view, recorded test — writing no HTML and never restarting; the change promotes through a release diff; and the route’s latency shows up on a scraped dashboard.

Delivered as the marketplace admission profile (tesseraql admission, realizing the Phase 37 gate), the three-app template gallery (purchase-request / inventory / helpdesk, each admission-held in CI), and the five-minute demo (docs/five-minute-demo.md, deploy/Dockerfile.demo). Phase 47 is complete, and with it milestone M12 is met — every leg of the loop is held green by an integration test (the zero-restart M7 loop, the recorded test, the release diff, the Prometheus exposition). Phase 44 followed, completing Horizon 8 in full.

Horizon 9 — the business-application platform (post-M12)

Section titled “Horizon 9 — the business-application platform (post-M12)”

Added 2026-07-04. With the low-code loop closed, the next gap is what every business application re-implements around its pages: the cross-cutting surfaces end users expect from an enterprise platform — the shell’s user menu, a settings screen for language / theme / notifications, session self-service. The direction (set by the maintainer) is that the platform should own these common foundations the way it owns routes and views: one framework answer, extended declaratively per app, honest about what each deployment supports.

The horizon opens with one phase; further phases join as the direction develops.

A framework-owned user menu and self-service settings surface. The full design is in docs/account.md; the shape:

  • A PreferenceStore SPI over a managed tql_user_preference table (the EventChannelStore pattern), keys namespaced ui.* / notify.* / app.*, the subject always the session principal’s by construction.
  • A reserved _account shell variable (beside _csrf / _menu) rendering an avatar + popover menu in the shared shell — Studio, the docs portal, and the ops console inherit it for free.
  • A bundled /_tesseraql/account system app (the auth-ui precedent): profile, language (a new preference.<key> source in the Phase 22 locale chain), theme (replacing the shell’s hardcoded data-theme), notification opt-out (an optional recipient: on notify: plus operator-marked user-facing channels), sessions (“sign out other sessions”; tql_session gains an indexed subject), and local-realm password change — with honest disabled states wherever a deployment delegates to an IdP.
  • App extension via config/preferences.yml: declared preference groups render as settings sections and read back through a preference.<key> namespace in routes, templates, and 2-way SQL.

Machine-checkable throughout: a TQL-ACCOUNT error domain (48xx), preferences.yml lint, and a preference NOTE coverage kind. Five slices (store + chrome; language + theme; notifications; sessions + password; preference groups).

Milestone M13 — an end user of a gallery app signs in, switches language and theme (persisted server-side), opts out of a notification channel, signs out their other sessions, and changes their local password — the app contributing nothing but preferences.yml; the same app under SSO shows provider-managed states instead.

Delivered 2026-07-04 across five slices: the preference store + shell user menu + bundled account app; language + theme through the locale chain and the model-driven shell theme; recipient-aware notification opt-out decided at enqueue; session self-service (tql_session subject, sign-out-others) and the local-realm password change over the login path’s own contracts; and app-declared preference groups (config/preferences.yml, lint TQL-YAML-1030..1033, the preference NOTE coverage kind, the preference.<key> request namespace, dogfooded by the inventory gallery app). Every leg is held green by AccountSurfaceIntegrationTest (17 scenarios on real PostgreSQL, including the honest disabled/SSO states). Phase 48 is complete and milestone M13 is met.

Phase 49 — the in-app notification center

Section titled “Phase 49 — the in-app notification center”

The shell’s bell: business events land in a per-user inbox instead of (or beside) mail. A third channel type, inbox, delivers a notify: event into a managed tql_user_notification table — addressed by the Phase 48 recipient: expression, so the outbox’s at-least-once retries, the per-user opt-out, and the coverage/lint surfaces all apply unchanged. The shell grows an unread-badge bell (a reserved _inbox variable beside _account/_theme); /_tesseraql/inbox lists, marks read, and marks all read. Deliveries dedupe on the outbox event id (a retry after a crash never doubles a message); retention prunes read messages by age. An inbox-channel notification without recipient: is a lint error — an inbox message must be addressed. Design: docs/inbox.md. Two slices: delivery (channel type, store, dedupe, lint), then the surface (bell, page, docs).

Milestone M14 — a gallery app declares one inbox channel and one recipient:-addressed notify:; the event shows up as an unread badge in the shell and a message in the inbox, reading clears it, opting out silences it — zero app code beyond those declarations.

Delivered 2026-07-04 in the two designed slices: the inbox channel type over the Phase 20 outbox (recipient/tenant riding the envelope, event-id dedupe, inline TEXT title/body templates, read-message retention, lint TQL-YAML-1034), then the shell bell (_inbox, TTL-cached unread count) and /_tesseraql/inbox (list, mark read with TQL-ACCOUNT-4806 owner-checks, mark all read, the honest no-channel empty state). Held green by InboxDeliveryIntegrationTest on real PostgreSQL end to end. Phase 49 is complete and milestone M14 is met.

Phase 50 — credential lifecycle completion

Section titled “Phase 50 — credential lifecycle completion”

What slice 4 of Phase 48 opened, finished — reset, invitations, and a second factor for the local realm, all JDK-only over existing machinery. The full design is in docs/credential-lifecycle.md; the shape:

  • One managed tql_credential_token store (hashed 256-bit tokens, purpose-bound, single-use by check-and-set, cooldown on issue) behind reset and invitations alike.
  • Password reset: a public auth-ui pair (/_tesseraql/reset, /reset/confirm), the destination from a new overridable pack contract (find-recovery-destination-by-login, default tql_users.email), the mail riding the outbox on an operator-named channel, anti-enumeration end to end, and every session of the subject invalidated on success.
  • Invitations: the bundled IAM admin grows Invite usercreate-user with status INVITED (which the credential contract already refuses at login), the same token machinery with purpose invite, and /_tesseraql/invite sets the first password then enable-user flips ACTIVE.
  • TOTP: RFC 6238 over javax.crypto.Mac + a small Base32 codec in tesseraql-security; enrollment on the account page (confirm-before-store), an optional code field on the login form that a confirmed enrollment makes required (failures indistinguishable from a wrong password), and a last_used_step replay guard. Recovery codes deliberately deferred.

Milestone M15 — on a local-realm gallery deployment: a locked-out user recovers by mail and every old session dies; an invited user goes from nonexistent to signed-in without an operator ever knowing a password; an account carries a second factor whose codes cannot replay — all JDK-only, no new dependency.

Delivered 2026-07-04 in the three designed slices: reset (tql_credential_token, hashed single-use tokens, anti-enumeration end to end, sessions killed on consume, TQL-SEC-4120 fail-fast config); invitations (IAM-admin Invite user, status INVITED refused at login, polite resends, 409 against takeover); and TOTP (RFC 6238 over javax.crypto validated against the RFC’s own vectors, confirm-before- enforce enrollment, the last_used_step compare-and-set replay guard, and login failures indistinguishable from a wrong password). Held green by RecoveryIntegrationTest, InviteIntegrationTest, and TotpIntegrationTest on real PostgreSQL. Phase 50 is complete and milestone M15 is met.

Phases 51–52 — recorded candidates (maintainer names which proceeds)

Section titled “Phases 51–52 — recorded candidates (maintainer names which proceeds)”

Direction candidates for this horizon, recorded 2026-07-04; each gets its own design doc when named:

  • Phase 50 — credential lifecycle completion named 2026-07-04; see below.
  • (Phase 51 was named 2026-07-04; see its section below.)

Phase 51 — personal productivity: pins and recents

Section titled “Phase 51 — personal productivity: pins and recents”

Named 2026-07-04; the accepted design is docs/productivity.md. One deliberate collapse from the candidate wording: a saved filter is a pinned URL whose query string rides along — one control on every shell page (list views, the Studio data browser, dashboards) instead of per-surface machinery. Ships as: pins (capped, labelled, a Pinned sidebar group on every shell page + account-page management, with relative-path-only hrefs so a pin can never point off-site) and recents (an automatic bounded ring of view: detail renders, deduped and bumped, listed on the account page only). One managed tql_user_shortcut table behind one SPI; the account-surface construction invariant throughout. Two slices: pins, then recents + the list pattern’s Pin this view.

Milestone M17 — a user pins a filtered list view and a Studio data-browser query and both reappear in the sidebar of every page they open; the records they view collect in a bounded recent list on the account page; removing and re-labelling work from there — per user, zero app code, and a pin can never point off-site.

Delivered 2026-07-04 in the two designed slices: pins (the header toggle on every shell page, the Pinned sidebar group, the account card, relative-path-only hrefs down to the backslash form) and recents (the automatic deduped ring of view: detail renders, labelled by the view’s own title). Held green by ShortcutIntegrationTest on real PostgreSQL. Phase 51 is complete and milestone M17 is met — with it, every phase named into Horizon 9 (48–52) is complete.

  • (Phase 52 was named 2026-07-04; see its section below.)

Phase 52 — workflow delegation and absence

Section titled “Phase 52 — workflow delegation and absence”

Security-design-first, like Phase 37; the accepted design is docs/delegation.md. Phase 28 already lets a task’s holder hand one task over; this phase adds the standing rule — an absence window with a delegate, applied where assignees are resolved — under four invariants: delegation redirects assignment and never borrows identity (the delegate acts as themselves; canAct, guards, and scopes untouched); one hop, never a chain (loops impossible by construction); only the delegator writes their own rule (the account surface’s self-service invariant, delegate resolved from login id under the managed realm); and the trail is structural — the persisted task row carries meant/received/acted columns, no new history format. Resolution applies at the transition assign: rows, the sweeper’s reassign fallback, and the per-task delegate target; candidate groups and already-open tasks are deliberately untouched. Two slices: the rule + resolution, then the IAM-admin visibility panel + the purchase-request gallery proof.

Milestone M16 — on the purchase-request gallery app: an approver sets an absence with a delegate; a request submitted during the window lands in the delegate’s inbox marked “for” the approver; the delegate approves it as themselves and the trail shows who acted for whom; after the window ends new requests reach the approver again — no permission ever borrowed, no chain ever followed.

Delivered 2026-07-04 in the two designed slices: the rule + one-hop resolution at every assignee funnel (with the no-ghost-authority and never-a-chain invariants held by integration tests), then the IAM-admin Active delegations panel and the milestone loop proven against the REAL purchase-request gallery app (PurchaseRequestDelegationIntegrationTest). Phase 52 is complete and milestone M16 is met.

Phase 53 — multi-datasource routes: cross-connector reads and projected consistency

Section titled “Phase 53 — multi-datasource routes: cross-connector reads and projected consistency”

Named 2026-07-06; the accepted design is docs/multi-datasource.md. The runtime has carried named connectors since Phase 18 (per-connector pools, db/<name>/migration trees, TQL-APP-4201), but every route is compiled against main. One new word, datasource:, opens them — under one deliberate stance: a business operation is one local transaction on one connector, never two; no JTA/XA. Cross-database consistency is eventual and rides the existing outbox → channel → queue-consume machinery as a projection (datasource: on the consumer retargets only the apply transaction; the bus, its dedup records, and all framework bookkeeping stay on main). Reads pick a connector per route — or per named read query on a page — with dialect resolved per connector and explicit non-main selection authoritative over tenant routing. Main-anchored features (notify:, publish:, workflow, sequence:) on a non-main route are lint errors (TQL-YAML-1035..1037 guard the surface). Three slices: design; reads; projections.

Milestone M18 — on a deployment with two real PostgreSQL databases: an app declares a reporting connector and migrates it from db/reporting/migration; a page renders one widget from main and one from reporting; creating an order commits on main and a queue-consume projection upserts it into reporting; a rolled-back command projects nothing; a forced redelivery never doubles a row — all declared in YAML, and no XA anywhere in the stack.

Delivered 2026-07-06 in the three designed slices: the design; reads (route-level and per-named-query connector selection, per-connector dialect, explicit non-main selection authoritative over tenant routing, TQL-YAML-1035/1037, proven by MultiDatasourceReadIntegrationTest on two real PostgreSQL databases); and projections (the transactional recipes retarget their single-connection transaction, main-anchored features refused by lint TQL-YAML-1036 and the compile-time guard TQL-CAMEL-3112, proven by MultiDatasourceProjectionIntegrationTest: commit projects, rollback never does, a republished business key never doubles the projection). Phase 53 is complete and milestone M18 is met.

CLI distribution and upgrade delivery (cross-cutting)

Section titled “CLI distribution and upgrade delivery (cross-cutting)”

Phase 38 — CLI distribution and upgrade delivery

Section titled “Phase 38 — CLI distribution and upgrade delivery”

A cross-cutting distribution track (recorded 2026-06-20). Tier 1 ships immediately; Tiers 2–3 mature alongside Phase 35. Motivated by the 0.3.0 → 0.3.1 hotfix: the 0.3.0 CLI distribution shipped without the PostgreSQL JDBC driver (serve --embedded-db died with NoClassDefFoundError), and a user on the broken build had no in-tool signal that 0.3.1 fixed it. How users get and update the CLI is its own concern, distinct from Phase 35’s artifact publishing (Maven Central / Gradle plugin, aimed at app developers).

Constraint. The CLI keeps a dynamic classpath on purpose — ServiceLoader codecs/drivers, the --modules child classloader, signed plugins (the jpackage.yml rationale) — so a closed-world GraalVM single binary is out. The deliverable is therefore the existing fat jar + JRE (dist.zip/.tar.gz, already a bin/+lib/ layout) or the jpackage app-image (bundled JVM, no JRE prerequisite, built per-OS on v* tags). This shapes every channel below.

  • Tier 1 — immediate (delivered now).
    1. In-CLI passive update notifier: on run, an async, daily-cached, opt-out check of the GitHub Releases “latest” tag; if newer than TesseraqlVersion.current(), print one hint line (TesseraQL <new> is available — <releases URL>). Never blocks the command; fails silent when offline. Directly closes the 0.3.0 blind spot.
    2. Attach the jpackage app-images to the GitHub Release — they are built on tags but currently only uploaded as time-limited CI artifacts, so the JRE-free build has no stable download URL.
  • Tier 2 — primary channels (automate the version bump in the release workflow). 3. SDKMAN! vendor listing — the idiomatic JVM-CLI channel (mvn/gradle/quarkus/jbang); sdk install/upgrade tesseraql. The existing dist.zip already matches SDKMAN’s bin/+lib/ shape, making this the lowest-friction primary. 4. Homebrew tap (macOS/Linux) + Scoop/WinGet (Windows) — payload is the bundled-JVM app-image (no JRE prerequisite); the package manager owns upgrade; the release workflow bumps the formula/manifest.
  • Tier 3 — complements / later. 5. install.sh / install.ps1 (curl … | sh): detect OS/arch → fetch the latest app-image → unpack to ~/.tesseraql + symlink; re-run to upgrade. Fallback where no package manager exists. 6. Container image on GHCR (docker run ghcr.io/ingcreators/tesseraql:<v>) for CI/ephemeral use; “upgrade” = a new tag. 7. tesseraql self-update subcommand — fetch the latest release asset and replace the install in place, with checksum/signature verification (mind the Windows exe-lock on self-replacement). Deferred until the notifier + package managers cover the common path.

Keeps extension principle 4 (the notifier is opt-out and deterministic) and 5 (no new tesseraql-core dependency — the version check lives in the CLI module). Cross-references Phase 35 (distribution maturity) and Decision point 3 (pull distribution forward if adoption is near-term).

Named 2026-07-07; the accepted design is docs/vscode-extension.md. The editor is the fourth authoring surface after Studio, the MCP dev-tools, and the CLI — and the only one the real linter never reaches: Phase 43’s scaffolded JSON Schema wiring checks shape, nothing more. vscode-extension/ closes the loop as a thin editor shell over the existing engines, under one stance: the extension holds no validation logic. It runs the project-selected CLI (tesseraql.cliPath) and renders the findings contract the MCP dev-tools already emit, which tesseraql lint --format json makes the one cross-surface shape. The MVP: lint on save into the Problems panel at source:line:column, the CLI verbs (serve, test, migrate, admission, package) as palette commands, an explorer tree over the app layout, error-code hovers into the published reference, snippets aligned with the YAML surface — TypeScript with zero runtime dependencies (editor-free core modules unit-tested with node:test), a CI job on the docs-site toolchain (pnpm, Node 22), and the scaffolder recommending the extension. Marketplace publishing is an operator step (the Cloudflare-dashboard precedent); a full language server, Test Explorer integration, and Studio deep links are the recorded ladder above the MVP. Four slices: design; the CLI JSON contract; the extension MVP + CI; adoption wiring.

Milestone M19 — in a fresh tesseraql new app opened in VS Code with the extension: a route-breaking edit surfaces the real TQL-* finding at line and column within seconds of save and clears on fix; serve, test, and migrate run from the palette; the explorer reaches every route, view, migration, and test suite — no Studio, no hand-typed terminal.

Delivered 2026-07-07 in the four designed slices: the design; the CLI contract (lint --format json, proven against a broken scaffold by AppLifecycleCommandsTest); the extension MVP with its CI job (the editor-free core under node:test, the findings loop proven end to end — the real fat jar’s JSON parsed by the extension’s own contract parser mapping a missing-SQL error to its route file); and the adoption wiring (the scaffolder recommends the extension; the marketplace publish stays the recorded operator step, so M19 runs off the CI-built .vsix today). The linter also learned to accept a relative app home — the documented lint --app . form crashed before the end-to-end pass caught it. Phase 54 is complete and milestone M19 is met.

Named 2026-07-08; the accepted design is the Phase 55 section of docs/vscode-extension.md. The first rungs of the Phase 54 ladder, in the order they pay off and under the same stance (the extension computes nothing the framework already knows): reference navigation — file:/view:/ template: values become document links resolved by the documented app layout; tesseraql test --format json — the complete per-case results plus per-file SQL line/branch coverage with 1-based line lists, one JSON object on stdout, exit semantics unchanged; Test Explorer — suites discovered from tests/**/*.yml into the native test UI, runs executing the JSON contract and mapping back by case name; SQL coverage — the same run feeds the editor’s coverage API so covered/uncovered 2-way-SQL lines paint where the SQL is written; and a status-bar serve probe over the Phase 45 readiness endpoint. Single-case server-side filtering, message-key / policy / named-query navigation, and the full language server stay on the ladder. Five slices: design; links; the test contract; Test Explorer + coverage; serve status.

Milestone M20 — in a scaffolded app: Ctrl+click a file:/view: value jumps to the source; the Test Explorer lists every case, a run marks pass/fail inline and paints covered/uncovered lines in the route’s SQL; the status bar tracks tesseraql serve up and down.

Delivered 2026-07-08 in the five designed slices: the design; reference navigation (document links over the documented layout, the expect.rows and view-kind traps covered by the core tests); the test-run contract (test --format json, proven against real PostgreSQL by AppLifecycleDbCommandsIntegrationTest); Test Explorer + SQL coverage (native test UI runs over the contract, StatementCoverage painting covered/uncovered 2-way-SQL lines); and the serve status bar over the Phase 45 readiness probe (tesseraql.serverUrl), shipping extension 0.2.0. Phase 55 is complete and milestone M20 is met.

Phase 56 — editor intelligence: the remaining ladder

Section titled “Phase 56 — editor intelligence: the remaining ladder”

Named 2026-07-08; the accepted design is the Phase 56 section of docs/vscode-extension.md. The four remaining ladder items in the order they pay off — single-case runs (tesseraql test --case, the Test Explorer re-runs one failing case alone); Studio deep links (Open in Studio onto /_tesseraql/studio/ui/source?path=…); MCP registration (one command writes the Phase 24 dev-tools server into .vscode/mcp.json and/or the repo-root .mcp.json); and the language layer (a tesseraql symbols --format json contract — policies, message keys, routes with source lines — powering completion and go-to-definition for policy: and message: values). Design decision recorded: the “full LSP” ships as in-extension providers over the symbols contract; the LSP wire protocol joins the ladder for the day a second editor is targeted. Five slices: design; single-case runs; Studio links; MCP registration; the language layer.

Milestone M21 — in a scaffolded app: one failing case re-runs alone; a route file opens in Studio from the editor; one command registers the MCP server and a connected agent lists the dev tools; policy:/message: values complete from the app’s declarations and Ctrl+click lands on them.

Delivered 2026-07-08 in the five designed slices: the design; single-case runs (tesseraql test --case through a filtered AppTestRunner overload, proven against real PostgreSQL, wired into Test Explorer run requests); Studio deep links (Open in Studio onto the source view every Studio surface already links to); MCP registration (merge-preserving writes into .vscode/mcp.json / .mcp.json, foreign entries confirm-gated); and the language layer (tesseraql symbols — policies, default-locale message keys with catalog lines from an indentation-stack walker, and routes — powering completion and go-to-definition, proven end to end against the real fat jar). The recorded decision held: providers over the symbols contract, no LSP wire process; extension 0.3.0. Phase 56 is complete and milestone M21 is met.

Phase 57 — the Studio–editor boundary, kept honest

Section titled “Phase 57 — the Studio–editor boundary, kept honest”

Named 2026-07-08; the accepted design is the Phase 57 section of docs/vscode-extension.md. Three slices realizing the boundary review’s recommendations: the boundary itself codified as extension principle 6 (this entry); the reverse deep link — the Studio source view gains Open in editor (vscode://file/…, the local-dev counterpart of the editor’s Open in Studio); and framework-derived form options — the route form’s recipe, auth, and input-type choices come from the framework surfaces the shipped JSON Schema is drift-tested against, instead of hand-coded lists (which had already drifted: the form offered four auth modes; the framework accepts five — public was missing). Deliberately not chosen: generating the whole form from the schema — the form is a curated subset with the text editor as the escape hatch, and full generation would couple its UX to schema structure for little gain.

Milestone M22 — in a running scaffolded app: the Studio source view jumps to the same file in VS Code; the route form offers exactly the recipes, auth modes (including public), and input types the framework accepts — the schema, the linter, and the form provably in sync.

Delivered 2026-07-08 in the three designed slices: the principle codified (extension principle 6, this document); the reverse deep link (Open in editor on the Studio source view, traversal-guarded and percent-encoded, best-effort local-dev by design); and framework-derived form options (knownAuthModes() / knownInputTypes() alongside knownRouteRecipes(), real security.auth enum in the shipped JSON Schema, SchemaSyncTest extended, the generated YAML-surface reference regenerated) — fixing the live drift the review predicted: the form offered four auth modes where the framework accepts five, and auth: public is now offered and integration-asserted. Phase 57 is complete and milestone M22 is met.

  • Platform maintenance: weekly Dependabot triage (policy encoded in .github/dependabot.yml); Camel LTS-line upgrades; the Spring Framework 7 / Boot 4 migration is a deliberate project (majors are Dependabot-ignored) — schedule it alongside Horizon 5 so 1.0 does not freeze on aging majors; review the JDK baseline at each LTS.
  • Documentation: every phase ships its cookbook entry; the example gallery stays green in CI.
  • Coverage: every new declarative surface ships its own coverage kind and thresholds.

Invariants every phase must keep:

  1. SQL-first: any capability touching data is expressed in plain-SQL-tool-runnable 2-way SQL. No ORM, no hidden runtime SQL generation.
  2. Declarative surface, governed escape hatches: new integrations appear as recipes under the same lint/governance/risk model — never as raw Camel in user apps.
  3. Deny-by-default security and the TQL-* error taxonomy extend to every new endpoint.
  4. Machine-checkable everything: each feature adds its lint rules, coverage kind, and deterministic generated artifacts (reproducibility, ch. 48).
  5. Module boundaries hold: tesseraql-core stays dependency-free; heavy dependencies live in leaf modules behind SPIs.
  6. Two surfaces, one engine: Studio owns the live runtime side — data, state, and audited draft/apply writes under runtime governance; the editor owns the source-of-truth loop — files, git, tests, findings. Both are thin renderers over the same engines and CLI contracts; neither re-implements the other’s trust model (no data browsing or live-state editing in the editor, no git in Studio), and they meet through deep links.

None block Phase 18; flagged for the maintainer as their horizons approach.

  1. PDF engine (Phase 21): openhtmltopdf (LGPL) vs Apache PDFBox stack (Apache-2.0) — a license-policy call. Resolved 2026-06-12: both were prototyped behind the codec’s engine SPI and openhtmltopdf was adopted (full page-oriented CSS; the LGPL dependency stays confined to the opt-in tesseraql-pdf module). The SPI remains the seam for replacing it.
  2. Workflow engine (Phase 28): native SQL-contract implementation vs embedding an external engine. Resolved 2026-06-15 in favour of the native state machine: it reuses the transactional write engine (Phase 18), row scoping and the org-unit foundation (Phase 29), the core expression language, and the cluster-safe scheduler, adding no runtime dependency — where an external engine would break SQL-first (principle 1) and the module boundaries (principle 5). The WorkflowStore SPI and the kind: workflow document keep the seam an external engine could later plug into. The full design is in docs/approval-workflow.md.
  3. Adoption timing: Maven Central and the docs site sit in Horizon 6; pull them forward if external adoption becomes a near-term goal.
  4. AI ambition (Phase 24): the dev-tool MCP server is the scoped bet, and it shipped with its protocol core factored out (tesseraql-mcp) so the runtime can later serve application-declared MCP endpoints from YAML (the Phase 24 “next step”). Deeper Studio-copilot features only if the MCP loop proves valuable.
  5. Spring 7 / Boot 4 timing: proposed alongside Horizon 5, before the 1.0 freeze.
  6. Object-store client and test fixture (Phase 30): the S3 client is AWS SDK for Java v2 (Apache-2.0), confined to the opt-in tesseraql-s3 leaf module — one module covers AWS and all S3-compatible stores; a JDK-only SigV4 alternative (in the spirit of the JDK-only OIDC/mTLS) stays available behind the BlobStore SPI. MinIO is not adopted, even as a test fixture: the MinIO server is AGPLv3 and its community edition has entered maintenance mode (admin UI removed in 2025), so — though a separate-process test container would not propagate AGPL — the compatibility ITs use Adobe S3Mock (Apache-2.0), keeping the supply chain permissive. See docs/attachments.md.
  7. View rendering strategy (Phase 39): compile kind: view into the existing template pipeline at build time (a deterministic, diffable generated artifact) vs interpret the view model at render time (one live source, no regeneration step). The customization ladder weighs toward interpretation: a pattern override (L2) is then pure template-chain resolution at render time — the resolver order in Templates already models it — where the build-time variant needs a regeneration step after every override edit. A design document precedes code, like approval-workflow.md; either way the emitted hc markup stays the public contract (mandatory rule 11). Resolved 2026-07-03 in favour of interpretation (see docs/declarative-views.md): pattern overrides stay pure resolver-chain lookups, derived list columns need the live row shape, and rendering is a pure function of (document, fragments, model) so reproducibility needs no generated artifact — while parsing, reference checks, and lint stay at build time.
  8. Copilot model access (Phase 44): an operator-configured model endpoint (credentials via the SecretResolver SPI) vs riding a connected MCP client’s model. Invariant either way: TesseraQL ships no model, stores no key in app source, and every write remains a separately gated, audited tool call. Resolved 2026-07-03 in favour of the operator-configured endpoint (OpenAI-compatible chat completions; key resolved lazily through the config placeholder chain) — riding a connected MCP client’s model stays available through the Phase 24 studio_copilot prompt, so both halves of the decision are served.
  9. Metrics transport (Phase 45): a JDK-only Prometheus text-format endpoint (no new dependency, in the spirit of the JDK-only OIDC/mTLS choices) vs adopting OTel/Micrometer histograms inside tesseraql-observability. Module boundaries (principle 5) decide where it lives; both keep the in-process ring tracer. Resolved 2026-07-03 in favour of both, split by module boundary: the Meter abstraction gained a histogram, a JDK-only AggregatingMeter + Prometheus text exposition live in tesseraql-core/the runtime (no new dependency on the scrape path), and tesseraql-observability maps the same histograms onto OTLP — the ring tracer stays. The scrape endpoint is opt-in and policy-gated.
  10. Account-surface delivery (Phase 48): a bundled system app riding the shared shell vs scaffolded pages vs a mountable app. Resolved 2026-07-04 at design time in favour of the bundled system app (the auth-ui precedent): zero setup, updates flow with the framework, and one consistent chrome across the app, Studio, docs, and ops — while the customization ladder keeps app control real (shell/pattern overrides, menu.yml, preferences.yml, and a kill switch for apps that own the surface themselves). See docs/account.md.